CONNECTION OF FUME EXHAUST VENT
Important
Make the connection in compliance with
the relevant legal requirements, using ap-
propriate and recommended materials.
Connecting to a fan extractor hood
To carry out this operation, proceed as follows.
1 - Position the appliance underneath the hood (A)
(see diagram).
A
IT
TESTING OF THE APPLIANCE
GB
Important
Before it is put into service, the system
DE
must be tested to check the operating con-
ditions of every single component and
FR
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
ES
full.
To test the system, make the following checks.
1 - Turn on the gas supply tap and check that the
connections are right.
2 - Check that the mains gas is the same as that
used for commissioning of the appliance, and
carry out the conversion procedure if necessary
(see page 17)
3 - Check that the burner is switching on correctly
and its combustion.
English
A
Important
The gas supply tap must open automatical-
ly when the fan of the extraction system is
switched on.
A
4 - Check the gas pressure and flow-rate at mini-
mum and maximum settings and adjust if nec-
essary (see page 12)
5 - Check that the safety thermocouple is working
correctly.
6 - Check that there are no gas leaks.
7 - Check that the nameplates specify the correct
gas for the country of use.
After testing, if necessary instruct the user in all the
skills necessary for putting the appliance into oper-
ation in conditions of safety, in accordance with le-
gal requirements.
- 18 -