Kohler K-13960 Guia De Instalacion página 8

Ocultar thumbs Ver también para K-13960:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hot and Cold
Water Supplies
Flathead
Screw
Base
Connect
supply here.
3. Install the Foot Control Unit
Mount
Align the screw holes and place the base onto the back of the
valve. Secure with three flathead screws (provided).
Apply thread sealant to the hot and cold water supplies.
Connect the cold and hot water supplies to the valve.
Secure the valve with base to the finished wall with three flathead
screws (not provided).
Connect
Apply thread sealant to the supply tube.
Connect the supply tube to the valve outlet and angle stop.
Cover
Slide the cover over the valve.
Ensure that the cover does not have contact with the foot
pedal(s). If the height of the foot pedal(s) needs to be adjusted,
refer to the "Adjust the Foot Pedal(s)" section.
Secure the cover to the valve with a plated screw.
1034416-2-C
Angle Stop
Supply Tube
Valve Outlet
Cover
8
Plated Screw
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-13961

Tabla de contenido