Ingeteam NEO Pro Manual De Instalacion Y Uso página 18

Ocultar thumbs Ver también para NEO Pro:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam
5.
Prepare the wiring between the three-phase energy meter and the Smart Gateway (stripping the cables
6 mm at the ends that go to the latter), put the contacts of the power and neutral cables in the Smart
Gateway and tighten the screws.
Phase 1
Phase 2
Phase 3
Neutral
6.
Run an Ethernet cable with RJ45 connectors on both ends and connect it to the Smart Gateway and the
charger.
CAUTION
Connect it to either of the two RJ45 sockets on the charger.
18
Phase 1
Phase 2
Phase 3
ABV2012IQM01_ - Installation and Operation Manual
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido