Inspection And Maintenance - flamco Flamcovent Smart Instrucciones De Instalación

Ocultar thumbs Ver también para Flamcovent Smart:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 10
1. General
The Flamcovent Smart air separator is intended for heating and cooling systems with a water or
water-glycol mix (maximum 50%).
The Flamcovent Smart may be hot during operation.
Minimum and maximum system temperature:
Minimum and maximum system pressure:
Minimum and maximum operating pressure:
Maximum velocity rate:
Maximum static height above Flamcovent Smart:
Central heating:
Cooling system:
Safety requirements
Installation and maintenance must be carried out by qualifi ed personnel.
Observe local regulations and guidelines.
2. Installation
Do not install the product above a suspended ceiling or in the vicinity of electronic installations!
Install the Flamcovent Smart in a dry location not suscreptible to frost and which is easily
accessible for maintenance purposes.
Install the Flamcovent Smart in the warmest point of the installation for optimum effi ciency. Flush
the installation thoroughly installing the Flamcovent Smart.
For optimum effi ciency, the connection diameter of the Flamcovent Smart must correspond to the
pipe diameter of the installation. The use of reducing couplings is not recommended. Installation is
possible in horizontal, vertical and inclined pipes; always position the housing vertically (bleed cap
at top) (fi g. 3).
Install the Flamcovent Smart in the direction of fl ow in accordance with the arrow shown on the
connection housing. In a central heating system, the Flamcovent Smart should be positioned
immediately after the boiler or mixer valve in the supply line. In a cooling system, just before the
chiller (fi g. 4A, 4B, 4C, 4D).
The bleeding device is fi tted with a ¾" connection for possible connection of a drain (fi g. 5). Do not
use this connection for fi lling the system.

3. Inspection and maintenance

Perform regular visual inspections.
In the unlikely event of a leak from the air release port it may be closed with the screw (fi g. 6).
Only carry out maintenance when the system has cooled down, remembering to take account of
the pressure.
4. Removal
Depressurise the system and remove the Flamcovent Smart.
Observe local regulations for disposing of the Flamcovent Smart.
6
ENG
Installation and operating instuctions
–10 °C to +120 °C.
0.2 bar to 10 bar.
0.2 bar to 6 bar.
3 m/s.
30 metres (fi g.1).
15 metres (fi g. 2).

Publicidad

Tabla de contenido
loading

Tabla de contenido