Installation And Startup; Attaching The Torch Body; Connecting The Welding Torch To The Power Source And Cooling Unit - Fronius TTB 80 G Manual De Instrucciones

Ocultar thumbs Ver también para TTB 80 G:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 77

Installation and Startup

Attaching the
1
Torch Body
* Grease the O-ring before installation!
3
IMPORTANT! When installing the torch body, ensure that it is pushed all the way in and
snaps into place.
Connecting the
1
welding torch to
the power source
and cooling unit
52
1
180°
*
180°
2
1
2
3
2
4
NOTE!
1
Before commissioning, check the
sealing ring on the welding torch con-
nection and the coolant level.
Check the coolant flow during welding
operation at regular intervals.
4
5
6
1

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido