22-1/4"
36"
(56.5 cm)
(91.4 cm)
9-9/16"
3-5/8"
(24.3 cm)
(9.2 cm)
6" (15.2 cm)
Lavatory Rim
Roughing-In
For K-2432:
IMPORTANT! The rough-in plumbing must extend 3" (7.6 cm)
beyond the finished wall.
Remotely locate the shut-off valves (such as below the vanity)
according to the roughing-in information. Use a 90° shut-off valve
with 3/8" compression outlet.
Install water supply lines according to the roughing-in
information.
For All Models:
Install all electrical supply lines according to the roughing-in
information. A Class A Ground-Fault Circuit-Interrupter (GFCI) or
Earth-Linkage Circuit Breaker (ELCB) must be used.
1059686-2-A
21" (54.6 cm)
10-1/2"
Centerline
(26.7 cm)
Bracing
High Voltage
Supply Rough-In
Location
22-7/8"
(58.1 cm)
Bracing
Water Supply
Rough-In
3" (7.6 cm)
Location
Faucet Spout
View from Bottom
Location
4
8-3/4"
(22.2 cm)
Kohler Co.