2.1.2 Electrical Installation
Before plugging the equipment on the socket, make sure the network voltage is the same
as indicated on the cord label.
The power plug has 3 (three) pins, the middle one is designed to grounding – Ground Pin.
All the 3 (three) pins must be properly connected before operating the equipment.
Make sure the network voltage where the equipment is going to be installed is the
2.2 Pre Operation
Before using the Centrifuge Juicer, the parts that will be in contact with the product that
will be processed shall be washed with water.
01
02
03
04
05
8
IMPORTANT
same as indicated on the cord label.
Assembly Sequence
01 - Pusher
02 - Liquid Chamber Lid
03 - Sieve
04 - Liquid Chamber
05 - Motor Support Flange