Zoeller QWIK JON PREMIER 201 Instrucciones De Instalación página 7

Ocultar thumbs Ver también para QWIK JON PREMIER 201:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 4
1)
Cut and
dry-fit
the pipe and
diameter discharge pipe (may be reduced to 3/4" [DN20] diameter
if local code allows it.)
2)
While
dry-fitting
the discharge pipe, position and mark the location of
the pump unit discharge
fitting.
3)
Cut and
dry-fit
1-1/2" (DN40) vent pipe as required to ensure that
the
vent
pipe does not interfere with other components. Make the
connection to the pump unit with the provided street elbow.
A 2" x 1" 90° discharge
Proper venting is required.
4)
Temporarily set the toilet in place to check that there is no piping
interference. Remove the toilet and set it aside.
5)
Clean, prime and solvent weld the discharge piping and pump unit
discharge
fittings
as required for 1" (DN25)
fitting
has been provided.
© Copyright 2020 Zoeller Co. All rights reserved.
PIPING
When applying solvent weld to discharge
none gets into the check valve assembly. Pay close attention to the proper
alignment of the discharge
6)
For markets requiring a pipe vent, clean and solvent weld the vent piping
as required for proper venting.
Note: Adding other bathroom fixtures - The Qwik Jon® Premier is designed to
accept additional bathroom fixtures utilizing the two side inlets. These inlets can be
attached via the 2" NPT (outside diameter) or the 1-1/2" (DN40) slip (inside diameter).
These inlets must have the inner portion drilled out using a 1-3/4" (44 mm) hole saw.
This is to ensure there is no leakage problems from inlets not in use. When utilizing
side inlets, install a check valve on the incoming line.
Once the side inlet opening has been drilled out, remove burrs
and rough edges to avoid the potential for clogging.
- 7 -
ensure that
previously marked.

Publicidad

Tabla de contenido
loading

Tabla de contenido