Levolor Roller Shades Fabric Instalación página 7

Ocultar thumbs Ver también para Roller Shades Fabric:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket placement
will not interfere with any components inside the headrail.
Verify that the window casing has a minimum depth of 3
battery installation.
— If using the optional satellite battery pack, the minimum depth is 2
If flush mount (fully recessed mount) is desired,
a minimum mounting depth of 4
— If using the optional satellite battery pack,
the minimum depth is 3".
Mark approximately 1" from each jamb
for bracket location.
Mark screw locations for each end
bracket, 2 holes per bracket.
For the battery pack, an extra
shade bracket is provided and
should be positioned 6-10" from
the adjacent bracket.
If more than three installation
brackets come with your order, space additional bracket(s) evenly between the two
end brackets, no more than 30" apart.
Add the battery mounting clips to the "window side" of the two shade
brackets which will also hold the battery pack.
STEP 2: INSTALLING THE BRACKETS
Pre-drill screw holes.
— If installing brackets into wood, use
supplied screws.
— If installing into drywall, use anchors
in combination with supplied screws.
Screw in brackets at marked locations.
Ensure all brackets are square with
each other.
" is required.
3
4
Motorized Control Lift–Cassette Valance
INSTALLATION
" for the standard
1
2
1
Bracket
Bracket
Bracket
Bracket
Screw
Screw
".
8
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Roller shades solarRoller shades banded

Tabla de contenido