INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket placement
will not interfere with any components inside the headrail.
•
Verify that the window casing has a minimum depth of 3
battery installation.
— If using the optional satellite battery pack, the minimum depth is 2
•
If flush mount (fully recessed mount) is desired,
a minimum mounting depth of 4
— If using the optional satellite battery pack,
the minimum depth is 3".
•
Mark approximately 1" from each jamb
for bracket location.
•
Mark screw locations for each end
bracket, 2 holes per bracket.
•
For the battery pack, an extra
shade bracket is provided and
should be positioned 6-10" from
the adjacent bracket.
•
If more than three installation
brackets come with your order, space additional bracket(s) evenly between the two
end brackets, no more than 30" apart.
•
Add the battery mounting clips to the "window side" of the two shade
brackets which will also hold the battery pack.
STEP 2: INSTALLING THE BRACKETS
•
Pre-drill screw holes.
— If installing brackets into wood, use
supplied screws.
— If installing into drywall, use anchors
in combination with supplied screws.
•
Screw in brackets at marked locations.
•
Ensure all brackets are square with
each other.
⁄
" is required.
3
4
Motorized Control Lift–Cassette Valance
INSTALLATION
⁄
" for the standard
1
2
⁄
1
Bracket
Bracket
Bracket
Bracket
Screw
Screw
".
8
7