Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARE WALL CABINET
1. Prior to wall cabinet installation, remove doors
and door mounting hardware.
2. Cut an opening into the bottom panel to the
dimensions shown.
3. Cut out openings for the duct and electrical
wiring.
4. Install cabinet on the wall and secure per
cabinet manufacturer's recommendations. The
cabinet must be securely fastened to studs and
framing behind the drywall prior to hood instal-
lation.
Cabinet-
Widht
30"
36"
PREPARE THE HOOD
1. Loosley assemble both mounting brackets to
the hood using M4 x 30mm machine screws
and fl at washers.
2. Place the 8" damper/duct connector on top of
the range hood discharge opening. Remove
tape from damper fl aps. Secure with (4) 3.9 x
9.5mm screws.
NOTE: If the hood is used in the non-ducted
recirculation configuration, remove and
discard the aluminum damper fl aps.
3. Assemble wall spacer to the hood with (3) 3.9
x 9.5mm screws.
NOTE: The spacer is designed to fi ll a 5/8"
gap between the wall and the back of the
hood. If the gap is larger, a non-combustible
material that is in compliance with local
building codes must be used to fi ll this gap.
4. Remove foam block located between blower
and housing.
"A"
"B"
28-1/2"
15"
34-1/2"
18"
- 8 -

MOUNTING SCREWS

MACHINE
(3.9x9.5mm)
SCREWS
(M4x30mm)
WASHERS
MOUNTING SCREWS
(3.9x9.5mm)
WALL
SPACER

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

U102iU10236sbiU10230sbi

Tabla de contenido