Conditions of use

Follow local regulations on operating con-
ditions for hot-water heating systems.
Follow local regulations on water quality.
Observe the limitations on use in damp
rooms in accordance with local conditions.
Only use the radiator in closed heating systems.
Only transport and store the radiator in the
protective packaging.
Observe the minimum distances between
the radiator and ambient parts to ensure
air circulation: 50 mm.
With auxiliary electrical operation:
Please note that electrical units may only be
installed in certain areas in rooms with bath
and shower facilities when choosing the in-
stallation site. Observe the corresponding
local regulations.
Only operate the heating element with the
rated voltage (see rating plate).
Complaints
Contact the supplier.
Disposal
Take the packaging and parts not required
to a recycling centre or authorised waste
management facility. Observe the local
regulations.

Technical characteristics

Operating pressure: max. 6 bar
Test pressure: 7,8 bar
Supply temperature:
Hot water up to 110 °C (30 °F)
With auxiliary electrical operation, up
to 80 °C
Electrical connection (with auxiliary electri-
cal operation):
Heating element pre-installed at the
lower right or left in the radiator
Connection via the electrical unit
Heating element cannot be retrofitted
at IDV 10
Installation
Put down the radiator with installed heating
element (IDV11) so that the cable is not bent
or damaged.
6
Preparatory activities (see Fig. 1–9)
In the case of auxiliary electrical operation
ensure that a properly installed connector
socket (30 V, 16 A fuse) is available within
the range of the cable.
Check the delivery for completeness and
damage.
Lay out any tools that are required.
Remove the installation protective packag-
ing only at the fastening and connecting
points.
Viewed from the front of the radiator, the factory
layout is that the supply line (SL/VL - lower hole
open) is on the left and the return line (RL - upper
hole open) on the right (see Fig. A).
In order to swap the supply line and return
line: Exchange the grub screws in the con-
nection pieces.
Screw the screwed connection tightly onto
the connection piece.
Screw in the vent plugs.
Screw in and tighten the long fastening
screws into the upper sleeves.
Screw in and tighten the short fastening
screws into the lower sleeves.
With auxiliary electrical operation: Tighten
the heating element with a torque of 0 Nm.
If appropriate, install any accessories in-
cluded in the scope of delivery, such as a
towel rod, (see separate instructions).
Mount the upper fastenings (see Fig. 10–13)
Mark the drill holes (see Fig. A).
Drill the holes and insert the anchors.
At the wall adapters screw out the securing
screws and pull out the retainers.
Screw on the wall adapters with hexagon
socket screws. Take the position of the drill
hole into account.
Insert the retainers into the wall adapters.
Take the position of the openings into ac-
count.
Only screw on the retainers handtight with
the securing screws. This allows the retain-
ers to still be moved for alignment.
Pre-install the lower spacers (see Fig. 14–15)
Use a knife to cut the two snap-in bolts at the
second marking to the dimension 9 mm.
Install both spacers on the radiator.