Installation
Assembly of Components
11
12
14.12
14.11
14.2
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-052
Items 10.1–10.5 come preassembled as Item 10.
Items 14.1–14.2 come preassembled as Item 14.
Items 24.1–24.8 come preassembled as Item 24.
Bradley • 215-163UU Rev. C: ECO 19-05-034A
8
10
9
10.3
10.4
10.5
10.2
13
10.31
14.1
14
15
NOTE: Use
teflon tape
only.
27
26
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
If tee (Item 7) is used as a supply inlet,
use plug (Item 8) on tee (Item 2)
Optional 1¼" NPT Supply
Inlet (best for rigid support)
7
3
24.6
24.5
Flow control
24.4
this end
24
24.2
20
24.1
17
23
19
22
25.3
25.6
25.1
25
25.5
2/15/2021
1¼" NPT
2
Supply Inlet
24.8
24.7
6
24.3
5
20
18
21.1
21.4
4
2
25.2
3
25.4
2
1¼" NPT
Drain Outlet
1
S19-310UU
17
21
21.2
21.3
21.11
25.3
5