Brudden Movement EDGE Manual De Montaje página 62

Extensora
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
STEP 9 - STEEL CABLE ADJUSTMENT
17
NAME
Cable tensioner
N
NAME
Steel cable
F
NAME
Steel cable
18
NAME
Low profile hex nut
M8
THE RIGHT ASSEMBLE POSITION OF
THE CABLE TENSIONER (17), IS
INDICATED BY THE FRIEZE PLACED IN
ITS EXTREMITY!
(Figure 9-3)
CAREFUL TO NOT PASS THE CABLE UP
THE SCREW, IF IT HAPPENS THE CABLE
WILL BE DAMAGED N THE USE OF THE
EQUIPMENT.
(Figure 9-4).
THE CABLES SHOULD BE REGULATED
QTY
1x
AS DESCRIBED IN THIS MANUAL AND
CHECKED DAILY SO THAT IT DOES
NOT EXPECT FROM THE VOLTAGE,
AVOIDING POSSIBLE ACCIDENTS
WITH THE USER.
QTY
1x
N
17
18
F
Figure 9-1
Figure 9-3
Friese
Figure 9-5
X cm
The same distance of
the cables in the
tensioner and the load
multiplier, the chable
should be put
at the same time
X cm
24
Figure 9-2
To regulated the
steel cable tighten
or slack the
N
tensioner (17).
17
17
18
18
F
Figure 9-4

Publicidad

Tabla de contenido
loading

Tabla de contenido