Installing The Rail Guide; Setting The Rail Guide - Leister TWINNY T7 Manual De Instrucciones

Ocultar thumbs Ver también para TWINNY T7:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27

8.1 Installing the rail guide

The automatic welder does not have to be removed from the prefabrication wagon to install the rail guide. Posi-
tion the rail guide (22) and fasten it with the two cheese head screws (23) included in the scope of delivery.

8.2 Setting the rail guide

The automatic welder does not have to be removed from the prefabrication wagon to set the rail guide.
1. Undo the two cheese head screws (23) from each rail guide (22).
2. Set the rail guides (22) to the required width (between 226 and 264 mm).
3. Screw the two cheese head screws (23) tight to each rail guide (22).
22
Warranty
The guarantee or warranty rights granted for this device by the direct distribution partner/salesperson apply
from the date of purchase. In the event of a guarantee or warranty claim (verification by invoice or delivery
note), manufacturing or processing errors will be rectified by the sales partner through replacement delivery
or repair. Heating elements are excluded from warranty obligations or guarantees.
Other guarantee or warranty claims are excluded within the framework of mandatory law.
Damage resulting from natural wear, overload, or improper handling is excluded from the warranty.
No guarantee or warranty claims exist for devices that have been converted or modified by the purchaser.
14
23
22
22
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Twinny t5

Tabla de contenido