Commissioning Adjustments - Sime FUEL 25 EV Manual De Uso, Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.7

Commissioning adjustments

Confirm the work carried out in the commissioning report shown below with a
Commissioning works
Check that the heating system has filled up adequately and has deaerated
Verify the fume exhaust system
Check that there are no leakages throughout the hydraulic circuit
Start the burner and check that it works efficiently
Measure the combustion parameters and record the fundamental data of the
initial start-up
Explain to the owner or to person in charge of the domestic system where the
burner is installed the importance of ensuring regular conditions for the entry
of combustion air and the expulsion of combustion by-products; in addition, they
must also point out that no modification can be made on the thermal machine
(consisting of the extraction system, heat generator and flue) that can alter the
system's correct operation
Conformation of the correct commissioning:
Stamp / date / signature of the company:
54
_________________________________________________________________________
=
or a
9
.
Notes
EN
Done

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fuel 35 ev8118500811850181185028118503

Tabla de contenido