Commissioning - Lenze L-force 9400 Instrucciones Para El Servicio

Ocultar thumbs Ver también para L-force 9400:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3

Commissioning

Step−by−step commissioning
Commissioning step
1.
Connect keypad to the front side of the basic
device on the diagnostic interface X6.
2.
If the keypad is supplied with voltage, it
carries out a short self test.
3.
The keypad is ready for operation if it
displays the main menu.
4.
You can now communicate with the basic
device.
EDB94AZKAE DE/EN/FR/ES/IT 2.2
Comment
You can also connect or remove the keypad
during operation.
If you commission the keypad for the first
time, you are requested to select the dialog
language.
How to navigate through the menus and how
to view and alter parameters can be learned
here: ^ 28
l
Commissioning
E94AZKAE055
3
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E94azkae

Tabla de contenido