General Installation Instructions - Norlake CAPSULE PAK Manual De Instalación

Sistema de refrigeración
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

G
I
I
ENERAL
NSTALLATION
NSTRUCTIONS

GENERAL INSTALLATION INSTRUCTIONS

This section has the general instructions for installing the ceiling
mounted Capsule Pak™ Refrigeration System. Before proceeding,
also see the following section on mounting "Remote Systems with
Electric Vaporizer", if applicable.
Note: Due to the weight of these systems, it is highly recommended
that proper lifting equipment, such as a fork lift or scissor lift, be utilized
during installation. Also, be sure to allow for sufficient airflow around
the condenser. A minimum clearance of two feet is required for proper
unit operation. If multiple units are located in the same area, be sure
they do not exhaust hot air into one another.
Position the insulated evaporator section of the Capsule Pak™ over
the hole in the walk-in ceiling section.
Align the tabs on the
side of the insulated
evaporator section with
the
predrilled
holes
in the ceiling section.
Before
proceeding
to the next step, the
evaporator cover should
be
removed.
Look
inside the evaporator
section and be sure the
air divider in the ceiling
section lines up with the
black gasket divider in
the evaporator section.
Some adjustment may
be required by simply
bending
the
ceiling
section divider slightly
forward or backward.
This will prevent any
short cycling of discharge and return air.
Fasten the insulated evaporator section down to the ceiling using
the provided drive screws, which can be found attached to the
side of the refrigeration system. CAUTION! This must be done
to prevent the entire refrigeration system from moving during
operation.
Note: On smaller refrigeration systems, you may elect to install the system on the ceiling section while the section
is still on the floor. CAUTION! Make sure to fasten down the system to the ceiling panel. The ceiling section and
the refrigeration system may then be erected together in the normal sequence of assembly as shown in the Kold
Locker™ Walk-in Installation Instructions. This method is not practical and should not be used with larger systems
of 100 series or above, such as a model CPF100, CPF150 or CPF151.
© 2008 Nor-Lake 4/08 PN 121430
6

Publicidad

Tabla de contenido
loading

Tabla de contenido