Descargar Imprimir esta página

Fontanot pixima RING TUBE Instrucciones Para El Ensamblaje página 7

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 12
Use elements C58, B12, B83 and B02 (fig. 1).
26. Identify the segments of the handrail not marked in red (A13) and the one marked in red (A14), which will be
used on the landing (E02) (fig. 9).
27. Start modelling the handrails (A13), do not mark them in red and try to give them a curve which follows the
staircase as much as possible (fig. 1).
28. Start from the baluster (C67) on the landing (E02) and begin by securing the handrail (A13), bent slightly. Use
elements C64 with the screwer. Warning: position the seam of the coating on the handrail toward the bottom.
29. Join to the other segments of the handrail (A13) tightening, gluing and shaping them one after the other. Use
elements B33, X01 and D72.
30. Saw off the excess handrail next to the first (C67) baluster the staircase using a hacksaw.
31. Complete the handrail (A13) by securing element A12 using elements C64 and the glue (X01) (fig. 1).
32. Determine the length of the bars A28 based on the staircase dimensions and cut them (fig. 1A). It is advisable
to bend the bar into a helical shape as close as possible to the handrail A13. Insert the bars A28 in the parts
D39-D40 previously assembled on the balusters C67 (fig. 1A) (Fig. 3). Join the bars A28 to each other using the
part A41 and the glue provided. Finally, tighten the parts C76 (fig. 1A).
33. Check the linearity of the handrail (A13) and correct using a rubber hammer, if necessary.
Assembling the balustrade
34. Assemble the column (C73) on element G01 protruding from the landing (E02), positioning articles D39 towards
the outside, using elements D49 (fig. 8) (fig. 1).
35. Position elements F34, using elements C58, B83, B02 on the landing (E02). Drill the landing (E02) using a
Ø 5 mm point, maintaining the same centre to centre distance between the holes as the one used between the
balusters (C67) of the railings assembled before.
36. Position the shorter balusters (C68) and tighten the elements B02 of the articles F34 (fig. 1).
37. Fasten element A15 to the column (C73) using element B02 (fig. 1).
38. Secure the handrail marked in red using elements C64 and the glue (X01). Saw off any handrail in excess using
a hacksaw. Complete the handrail (A14) by securing element A12 using elements C64 and the glue (X01)
(fig. 1).
39. Determine the length of the bars A28 based on the dimension of the balustrade and cut them (fig. 1).
40. Based on the position and the existence of walls around the opening of the staircase, one or two (C03) extra
balusters may need to be positioned (fig. 10).
41. In this case, consider a space equidistant from the other balusters or from the wall. To secure these, we
recommend drilling the landing (E02) with a Ø 5 mm point and using elements F34, C58, B83, B02. We also
recommend drilling the floor with a Ø 14 mm point and using elements F34, B02, B13 (fig. 11). If necessary,
secure the balustrade on the landing to the balustrade on the floor, (fig. 10), model the handrails carefully,
following well secured curves. Any wrinkles that form on the inside of the handrails are not a defect, rub
energetically (generating heat) with a paper tower until they disappear.
Final Assembly
42. To further stiffen the staircase at intermediate points, secure elements F09 to the wall and join using elements
F33, with the balusters (C68). Drill using a Ø 8 mm point and use elements C50, C49, C58, B12 (fig. 12).
After you have finished assembling the staircase,
please visit our website and send us your suggestions: www.pixima.it
7 - RING TUBE PVC

Publicidad

loading