Brod & Taylor FP-101 Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
All manuals and user guides at all-guides.com
GENERAL OPERATING INSTRUCTIONS
Set Up
Open the lid by lifting the front edge of the Proofer. Allow the lid to rest in a vertical
position. Remove the wire rack and water tray. Lift the expanding box section from the
front edge, allowing it to remain attached to the base at the back so it can pivot
open as shown in the center photo below. Unfold the walls and fit into the base.
Place the water tray on the center of the base plate. Put the wire rack in next with the
feet down. Lift the lid straight up from the rear hinges and place onto the top of the
expanded box, fitting the guides on the lid into the matching grooves. Lower the lid to a
closed position. Plug the power cord into the Proofer first and then into an appropriate
wall receptacle.
For Set Up, Do Not Remove Folding Walls
If the folding walls are removed from the base, it may be more time-consuming to set
up the Proofer.
Pre-Heat
For best results, the Proofer should be pre-heated for 10-15 minutes.
Operation
Plug in the Proofer. Press the ON/OFF button once and ensure that the green POWER
light is illuminated. Depress the UP or DOWN buttons to adjust the Proofer to the
desired temperature. Press and hold either the UP or DOWN button for three seconds
to quickly scroll through the temperature settings.
Page 5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fp-201

Tabla de contenido