Installation / Operation
AEXT SYSTEM INSTALLATION
AND OPERATION
NOTICE: Install this system during a time when the pri-
mary pump will not be needed. Gather all supplies
before starting. Read all the warnings and installation
steps before you start.
1. Place the AEXT battery box along side of the A5000
system cover.
2. Open the AEXT battery box and lower the new bat-
tery into it. See Figure 1.
A5000
Battery Backup
System
Figure 1
3. Feed one set (one black and one red lead) of wires
from the AEXT control box through the ventilation
slot in the top of the A5000 cover. See Figure 2.
Feed this set of leadwires
into the vent slot
of the "A5000" cover.
}
Dual Fused
AEXT
Control Box
Figure 2 - Installation
For parts or assistance, call Simer Customer Service at
AEXT
Extender
Kit
Vent Slot
A5000
Battery Backup
System
AEXT
Extender
Kit
Feed this set of leadwires
into wire opening of the
"Extender" cover.
3855 0101
4. Open the A5000 cover and attach the wires as illus-
trated in Figure 3.
Unplug the A5000 Transformer
from the wall outlet before
connecting the Batteries.
Dual Fused
AEXTControl Box
Figure 3 - Connect the wires.
5. Close and lock the covers of the Battery Backup
System and the AEXT Kit. Do not store the battery
box on the floor. See Figure 4.
115V AC
Grounded
Outlet
Transformer
Figure 4 - System Installed
1-800-468-7867 / 1-800-546-7867
3
A5000
Battery Back-Up
Unit
The Negative A5000 Battery
Terminal (BLACK Cable)
The Positive A5000
BatteryTerminal (RED Cable)
The Positive AEXT Battery
Terminal (RED Cable)
The Negative AEXT
Battery Terminal
(BLACK Cable)
}
AEXT
Extender Kit
3856 0101
A5000
Battery Backup
System
AEXT
Extender
Kit
3857 0101