Descargar Imprimir esta página

Yakima TRACKS Manual De Instrucciones página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Mark the remaining holes for each track.
You should plan to use every other
hole if you can. DO NOT skip more
than two holes in a row!
Center
punch, pilot,
drill, clear,
seal, install
Plusnuts®
(steps 5
through 11).
slide nut plates from your tower kit into
track (2 per tower / 4 per track).
attach end caps before attaching tracks to roof.
K E E P
1030988F-3/9
Do not use
washers
on bolts at
each end of
tracks.
T H E S E
apply a generous
amount of silicone
sealant into the
Plusnut® opening.
WARNINg: Direct contact of uncured sealant irritates eyes and may irritate
skin. Over exposure to vapor may irritate eyes, nose and throat. Avoid eye and
skin contact. Use with adequate ventilation. Do not handle contact lenses with
sealant on hands. In case of eye contact, flush with water for 15 minutes. Obtain
medical attention. In case of skin contact, remove from skin and flush with water.
Sealant releases acetic acid (vinegar-like odor) during cure.
With track on car, attach bolts and hard
washers through track into Plusnuts®.
note: there may be extra Plusnuts® because
not all holes in the tracks will be used.
ThIS PRODUCT IS COVERED bY YAKIMA'S
"LOVE IT TILL YOU LEAVE IT" LIMITED LIfETIME WARRANTY
TO ObTAIN A COPY Of ThIS WARRANTY, gO ONLINE TO
WWW.YAKIMA.COM OR EMAIL US AT YAKWARRANTY@
YAKIMA.COM, OR CALL (888) 925-4621
I N S T R U C T I O N S !
Loosen bolts and remove
track from vehicle.
Congratulations!
Install your towers
& mount your
accessories for your
next sporting
adventure!

Publicidad

loading