How to Assemble Your Ceiling Fan Blades
You will find the fan blade set packed in its own carton and the blade holders and hardware bag in the upper foam
packing in the fan box. The hardware bag for the blade holders consists of 10 screws and a Phillips head screwdriver.
INSTALLATION NOTE
Do not connect fan blades until the fan is completely
installed. Installing the fan with blades assembled
may result in damage to the fan blades.
1.
Lay side "A" of the blade holder on a flat surface
with the inside of the blade holder facing up. This is
the side with the threaded posts and pitched foot.
(Figure 1)
2.
Position the palm leaf, or the woven bamboo blade,
or the wicker blade over the blade holder with the
threaded posts showing. Make sure the bottom edge
of the blade is fully seated against the blade holder.
3.
Place side "B" of the blade holder on top of the
blade, positioning the holes over the threaded posts.
4.
With a philips screwdriver, thread both screws into
the posts but do not fully tighten.
5.
Prior to final tightening, position the centerline of the
blade holder with the center of the end of the blade.
6.
Tighten both screws to secure the blade. (Figure 1)
INSTALLATION NOTE
Attach the Blades to the Rubber Flywheel using the
holes marked #5 for 5-blade application. For 4-blade
application, use the holes marked #4.
7.
Attach blade holders to the bottom of the rubber
flywheel using the 10-32 x ½˝ Flywheel Screws.
8.
Make sure the screws securing the blade holders
to the flywheel are tight and that the blade holders
are properly seated on the flywheel. (Figure 2)
Fan Blade
3/16"-24 x 3/8"
Screws
NOTE:
Optional Wood blades and Blades Holders,
Canvas blades and The Ococee™ kayak oar blades
are available for this assembly.
Flywheel
Blade Holder
Screw
(2 per blade holder)
10–32 x 1/2˝
Screws
13
Side B
Figure 1
HARDWARE USED:
Figure 2
HARDWARE USED:
Side A
X 10
X 10