Tabs
Supply Inlet Holes
(Both Sides)
Roughing-In Illustration
Determine direction and location of urinal inlet, wall-mount box,
and supply outlet. Note location of inlet and outlet holes on wall
mount box.
Rough-in framing must be able to support the wall-mount box.
The rough-in supply pipe should terminate with a 3/8" NPT
thread. Leave a gap of 1/16" to 1/8" (2 mm to 3 mm) between
the supply pipe and the wall-mount box.
111769-2-AB
Wall
Mount
Box
3/8"
N.P.T.
Supply
Outlet
Wall Mount
Holes
Box
4
1/16" (2 mm) Min.
1/8" (3 mm) Max.
Kohler Co.