Before You Begin - DAYTEK MK 2 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BEFORE YOU BEGIN

Note: We recommend two persons to install this product
Please check that the carton contains all the
required parts before assembly.
Your carton should contain the following:
A – Main Tube Assembly
B – Hoist Tube Assembly
C – Ground Socket and Cap
D – Bonus Clothespins Bag
E – Bonus Clothespins (12 pcs)
F – Bonus Rotary Storage Bag
G – Bonus Sock Holder
A
B
Tools and materials required for installation:
C
F
G
2
Medium aggregate screenings (crushed rock)
20kg (44lbs) bags of pre-mix concrete x 2
Wooden or metal stakes 400mm (15 inch) long x 3
Length of rope approximately 2 meters (6.5 ft) long x 3
Spirit Level
E
D

Publicidad

Tabla de contenido
loading

Tabla de contenido