DAYTEK MK 2 Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLING YOUR ROTARY CLOTHESLINE
1. Once the concrete is dry, remove
the cord and stabilizing stakes.
2. Gently slide the hoist tube
assembly into the main tube
assembly until the units engage
together. The tube assemblies are
engaged when both the upper and
lower wind brake face meet.
(See Fig. 1)
3. Lock handle into final position by
pulling upwards on the handle grip.
(See Fig. 2 – 3)
4. Each clothesline arm is secured
with a plastic cable tie. Carefully
cut and remove each one making sure
not to cut or damage the clothesline
cord. (See. Fig. 4)
5. The clothesline cords are secured
to each arm with a rubber band.
Cut and remove these bands making
sure not to damage the clothesline
cord. (See. Fig. 5)
HOIST TUBE
ASSEMBLY
MAIN TUBE
ASSEMBLY
1
5
2
3
4
PLASTIC
CABLE
TIE
5
RUBBER
BAND

Publicidad

Tabla de contenido
loading

Productos relacionados para DAYTEK MK 2

Tabla de contenido