DAYTEK MK 2 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Securing the main tube assembly
8. Tie a length of rope from each stake to the main
tube assembly to secure it vertically. Check that
the tube is sitting vertically using a spirit level.
9. Prepare the pre-mix concrete and backfill the
hole with the concrete mix. Gently compact
the concrete.
MAIN TUBE
ASSEMBLY
1 METER (3.3 FEET)
10. Ensure the concrete is underneath the top
lip of the ground socket.
11. Re-check that the main tube assembly is
still vertical. Leave for 24 hours to set concrete
before assembling the hoist tube.
WIND BRAKE
LOWER
SPIRIT LEVEL
4

Publicidad

Tabla de contenido
loading

Productos relacionados para DAYTEK MK 2

Tabla de contenido