CP 0009, CP 0014
♦
After each service, check that the machine's
vibration level is normal. If not, contact the nearest
authorised workshop.
Every day
Before undertaking any maintenance or changing
the insertion tool on pneumatic machines, always
switch off the air supply and bleed the machine by
depressing the start and stop device then disconnect
the air hose from the machine.
Clean and inspect the machine and its functions
♦
each day before the work commences.
Conduct a general inspection for leaks and
♦
damage.
Check that the air inlet nipple is tightened and
♦
that the claw coupling is free from damage.
Check the function of the retainer. Make sure that
♦
it locks the insertion tool.
Change damaged parts immediately.
♦
Replace worn components in good time.
♦
Check the side bolts of the machine. Make sure
♦
that they are tightened.
♦
If the machine is equipped with a muffler, check
for damage.
Periodic maintenance
After each operating period of approximately 100
working hours or three times a year the machine
must be dismantled and all parts be cleaned and
checked. This work must be performed by authorized
staff, trained for this task.
Tightening torques
CP 0009
Thru bolt nut
CP 0014
Thru bolt nut
Assembly
When assembly the machine, be aware of the
following:
9800 0547 90c | Original instructions
D
E
F
♦
♦
♦
12-14 ft.lbf (16-19
Nm)
20-23 ft.lbf (27-31
♦
Nm)
Safety and operating instructions
Place the rotation release shifter plunger (A) in
the fronthead (B) before assembling the chuck
sleeve (C).
Be sure that the straight spline on the piston (D)
engages the straight spline on the chuck sleeve
(C), and that the spiral spline on the piston (D)
engages the spiral spline of the ratchet ring (E).
Assembly the ratchet ring (E) in the fronthead (B),
so that the flats of the ratchet teeth engage the
end of the pawls (F).
Tighten thru bolts evenly to prevent binding. After
tightening, rotate the chuck manually to make
sure that the rotation is free.
A
B
C
17