7. Installation and Starting of Operation
A large number of pollutants and particle sizes are produced in the various machining
processes of modern industry. A TBH extraction and filter system is used to remove particles
from their source, e.g. to protect the lens of a laser, but also to avoid health hazards for
employees on site.
Due to the modular design of the systems, it is possible to adapt the filter equipment to the
specific application. To ensure effective filtering, the tightness of the filter modules as well as
the hose connections and extraction elements must be ensured already during the
installation of the system on site.
When using a molecular filter (activated carbon filter), its suitability for the application and
regular inspection must be ensured.
7.1
Unpacking
The extraction and filter system is usually delivered on a pallet and is secured with belts and
additional fastening means, depending on the size of the system.
Warning! It is mandatory to observe the notes in the Transport section.
Pallet
•
Firstly, set the pallet on a level, suitable surface.
•
Now loosen the belts and any other attached fastening aids.
•
Afterwards, remove the transparent foil.
•
Depending on system size and filter equipment, the systems can be packed
differently. Smaller systems are packed in a cardboard box. Larger systems are
packed with two cardboard boxes pushed into each other.
Packaging in a cardboard box
•
Now, carefully open the cardboard box on the top side; be careful with sharp knives
or similar to avoid damaging the surface of the system.
•
Turn the system carefully with the top side down (Caution! Do not damage the
surface). Depending on the weight of the system, have a sufficient number of
helpers available.
•
Pull the cardboard off and remove the styrofoam parts.
•
The system can now be placed back on the castors.
Packaging in double cardboard box
•
Firstly, pull of the top cardboard box.
•
You can now lift the system out of the bottom cardboard box or carefully cut the box
open and slide the system out.
•
Finally, remove the styrofoam parts.
Please also note
•
Depending on the size and weight of the system, have enough helpers close by
and/or use suitable lifting equipment and aids.
•
Dispose of the packaging in accordance with the applicable regulations.
Installation and Starting of Operation