GB
1.) Information - read carefully
The instructions ( i.1 „General instructions" and i.2 „Product-specific
instructions") must always be available in the national language. If
these are not available, the seller must clarify this with SKYLOTEC
before resale. The instructions must be made available to the user.
Herewith you have purchased a lead set including emergency
lowering function. Be sure to read and observe the specific
instructions for the individual components. Before starting work, a
risk assessment and an emergency plan must be prepared and
known. Read and understand the instructions for all components
and check the set and all your equipment before each use. After a
fall, the entire set must be discarded and immediately withdrawn
from further use.
ItIt is forbidden to remove the metal cable tie from the lory itself!
(Fig.1) If this is no longer present, the set must be immediately
withdrawn from any use and sent to SYKLOTEC.
The SET has been produced in accordance with the working and
access procedure recognised in DGUV I 203-047 „Protection
against falls from a height during the construction and operation of
overhead lines".
It must be pointed out that only persons trained by SKYLOTEC
may use the set. Only persons trained by SKYLOTEC may change
the rope or carry out the annual inspection. The rope including the
shock absorber should be replaced after 10 years at the latest.
Emergency personnel with the training „Safe working in areas
where there is a risk of falling" (equipment set for fall protection DIN
14800-17), certified by a state fire brigade school or equivalent, are
also authorised to use and inspect the set
The maximum distance between two belay points (also ensured by
the loop method) must not exceed 1.6m (if necessary, set an
additional belay point, e.g. with a strap loop, see also Table 1).
Attention!
Up to a climbing height of 6.5 m there is an increased danger of
contact with the ground in case of a fall. Therefore, in this range,
distances of max. 0.5 m between the belay points are recommended.
6
MAT-BA-0219-00_20210505_in_Bearbeitung.indd 6
MAT-BA-0219-00_20210505_in_Bearbeitung.indd 6
Instruction for use
05.05.2021 08:15:52
05.05.2021 08:15:52