1
2
1
3
> 5 min
6
2
4 mm
1
2
3
> 5 min
English
Installation
Remove the dust cover.
Close the stops.
Cut the plaster shield so that it extends ¹⁄₁₆" -
⅛" from the finished wall surface.
Seal the wall around the
plaster shield with waterproof
sealant.
Failure to seal the wall can lead
to possible water damage.
Open the stops.
Flush the hot and cold supplies for at least 5
minutes.