Finishing The Indoor Unit Installation; To Insulate The Drain Piping, Refrigerant Piping And Interconnection Cable; To Pass The Pipes Through The Wall Hole; To Fix The Unit On The Mounting Plate - Daikin FTXP50M2V1B Manual De Instalación

Ocultar thumbs Ver también para FTXP50M2V1B:
Tabla de contenido

Publicidad

8
Finishing the indoor unit
installation
8.1
To insulate the drain piping,
refrigerant piping and
interconnection cable
1 After the drain piping, refrigerant piping and the electrical wiring
are finished. Wrap refrigerant pipes, interconnection cable and
drain hose together using insulation tape. Overlap at least half
the width of the tape with each turn.
a
b
c
d
f
e
a
Drain hose
b
Interconnection cable
c
Mounting plate (accessory)
d
Refrigerant piping
e
Indoor unit fixing screw M4×12L (accessory)
f
Bottom frame
8.2
To pass the pipes through the wall
hole
1 Shape the refrigerant pipes along the pipe path marking on the
mounting plate.
a
b
c
c
d
a
Drain hose
b
Caulk this hole with putty or caulking material
c
Adhesive vinyl tape
d
Insulation tape
e
Mounting plate (accessory)
NOTICE
▪ Do NOT bend refrigerant pipes.
▪ Do NOT push the refrigerant pipes onto the bottom
frame or the front grille.
2 Pass the drain hose and refrigerant pipes through the wall hole.
FTXP-M + FTXF-D + FTXF-A + ATXF-A
Daikin room air conditioner
3P512025-10U – 2021.07
e

8 Finishing the indoor unit installation

8.3
To fix the unit on the mounting
plate
1 Set the indoor unit on the mounting plate hooks. Use the " "
marks as a guide.
2 Press the bottom frame of the unit with both hands to set it on
the bottom hooks of the mounting plate. Make sure that the
wires do NOT get squeezed anywhere.
Note:
Take care that the interconnection cable does NOT get
caught in the indoor unit.
3 Press the bottom edge of the indoor unit with both hands until it
is firmly caught by the mounting plate hooks.
4 Secure the indoor unit to the mounting plate using 2 indoor unit
fixing screws M4×12L (accessory).
9

Commissioning

NOTICE
General
commissioning
commissioning instructions in this chapter, a general
commissioning checklist is also available on the Daikin
Business Portal (authentication required).
The general commissioning checklist is complementary to
the instructions in this chapter and can be used as a
guideline and reporting template during the commissioning
and hand-over to the user.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
9.1

Checklist before commissioning

After the installation of the unit, first check the items listed below.
Once all checks are fulfilled, the unit MUST be closed. Power-up the
unit after it is closed.
You read the complete installation instructions, as
described in the installer reference guide.
The indoor units are properly mounted.
The outdoor unit is properly mounted.
Air inlet/outlet
Check that the air inlet and outlet of the unit is NOT
obstructed by paper sheets, cardboard, or any other
material.
There are NO missing phases or reversed phases.
The refrigerant pipes (gas and liquid) are thermally
insulated.
Drainage
Make sure drainage flows smoothly.
Possible consequence: Condensate water might drip.
The system is properly earthed and the earth terminals
are tightened.
checklist.
Next
to
the
Installation manual
13

Publicidad

Tabla de contenido
loading

Tabla de contenido