S19-310SS
Assembly of Components
11
12
13
27
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-052
Items 9.1–9.2 come preassembled as Item 9.
Items 25.1–25.12 come preassembled as Item 25.
4
7
8
9
9.1
9.2
9.11
10
14
28
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
3/14/2013
If tee (Item 2) is used as a supply
inlet, use plug (Item 6) on tee (Item 2)
6
2
Optional 1¼" NPT
Supply Inlet (best for
rigid support)
3
25.7
25.6
25.5
25.4
25.3
25
25.2
25.1
24
23
26
26.2
26.1
26.5
26.3
2
1¼" NPT
Supply Inlet
25.12
25.11
25.10
5
25.9
25.8
Flow
control this
end
2
18
22
20
17
16
31
4
2
19
3
1¼" NPT
Drain Outlet
2
1
26.4
Bradley • 215-533 Rev. Y; ECN 12-05-033
Installation
15
16
17
21
30
20.1
26.6
26.1