Installing the AT-iMG606BD Multiservice Gateway
Connector shield
To install the AT-iMG606BD Multiservice Gateway, perform
the following procedure:
1.
Remove all equipment from the package and store the
packaging material in a safe place.
2.
Prepare the fiber optic cable by installing an SC
connector on the end that is going to connect to the
gateway.
The base unit has three parts, as shown in Figure 7.
Base
Cover
AT-iMG606BD Multiservice Gateway Installation Guide
Figure 7. Parts of the Base Unit
383
33