3 Handling
3.1 Prior to the initial Commissioning of the M210SE
In order to ensure that the battery inserted into the device at the factory is fully charged, insert the device into
the supplied DS210 docking station (if included in the scope of delivery), also see Section 3.2. Using the
supplied power supply unit, connect the docking station to the mains (Power LED shows a green light), also
see Section 3.2.
The battery charging process has been completed when the 'CHARGE' LED is green.
You can now use the M210SE handheld terminal.
You can see the battery charging process in Figure 2.
ATTENTION
ATTENTION
ATTENTION
M210SE_Lidl_Brief_Overview_FCC_V1.04_en_es.doc
Read all instructions first before using the M210SE!
Do not drink any alcohol or take any drugs while using the M210SE
and follow the saftey instructions carefully!
Only original ACD power supply units and ACD-approved batteries
may be used for the operation of the M210SE and the DS210. The
utilization of non-approved components can lead to the
destruction of the device. Remove the battery from the device if it
is not used for an extended period of time.
The M210SE battery is a lithium ion battery pack. Lithium ion
battery packs can explode if exposed to fire. Do not disassemble
the battery pack and do not expose it to fire or heat (greater than
140 °F).
Prior to each use, the mobile data acquisition terminal, the docking
station and the connection cables must be inspected for damages.
Damaged parts must be replaced. Please contact ACD in either
case.
5 / 32