Pump Disassembly; Pump Assembly - SHUR-DRI FLEXVANE SD106 Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
5
UNPLUG THE PUMP
Unplug the pump before all the water is
completely gone.
DO NOT RUN PUMP DRY!
PERFORMANCE
The pump will deliver 350 gallons/
1325 liters per hour with an unrestricted
discharge line. If the discharge line is
restricted or raised and the pressure on the
pump outlet port increases, it will pump
less water.
NOTICE: This pump's motor has brushes.
Inspect the brushes frequently; replace
them if they're worn.
Unplug
shock, burn, or cause death. Unplug pump
before servicing.

PUMP DISASSEMBLY

1. Remove the two cover screws (1), front
2. Remove the pump end (7) from the
3. Remove the metal insert (5) and
4. Remove the shaft seal (6). This may

PUMP ASSEMBLY

1. Install the seal (6) by pressing it into the
2. Apply a little lithium-based grease to
3. Turn the impeller clockwise as you push
4. Align the motor shaft so the flat section
5. Insert the O-Ring (3) and cover plate
6. Attach the assembly with the two cover
1 2 3
1 2 3
4
4
5
5
6
6
Hazardous voltage. Can
wear plate (2) and the O-Ring (3).
motor.
impeller (4).
need to be pushed out from the
backside.
recess.
the inside bore of the metal insert (5).
it into the metal insert. Make sure the
impeller is completely and evenly
seated. Slide the assembly into the
pump body (7).
on the shaft is lined up with the flat
area on the inside of the impeller. Slide
the pump body (7) with the insert and
impeller onto the motor shaft. Hold the
impeller so it stays in place.
(2). Make sure the O-Ring remains seat-
ed in the groove.
screws (1). Tighten these evenly, but do
not over-tighten the screws.
7
7
5

Publicidad

Tabla de contenido
loading

Tabla de contenido