GB
DETAILS OF THE CONTROL PANEL
ON/OFF switch
STARTING UP FIRST TIME
This procedure must be carried out when the system is first started up, and following
any operations that require the pool, the overflow tank.
When this operation becomes necessary, contact an authorized Teuco service centre.
1 - REMOVE THE CANVAS FROM THE MINIPOOL
See "Minipool Canvas".
2 - ISOLATE THE SYSTEM FROM THE POWER
SUPPLY
Set the main switch to the "OFF" position.
3 - CLOSE THE VALVES
Close all section valves along the various pipelines.
16
16
INSTRUCTIONS FOR USE
630HU