Module 1+2+3+3 (5.8 m platform height) (T4.10 – T4.15)
1. Mount the wheels (part T2.E) and secure with locking pin [T3.1]
2. Open the folding frame (part T2.A), place the platform (part T2.F) on the 2nd rung and secure it [T3.3 - T3.4]
3. Place a horizontal brace (part T2.G) above the wheels [T3.5 - T3.6]
4. Point the wheels outwards, adjust the base section with a spirit level and put the wheels on the brake [T3.2]
5. Mount the collar tubes (part T2.D) on the folding frame. Collar tubes must retain some play [T3.12 - T3.13]
6. Mount the collar tubes (part T2.D) on the folding frame (part T2.B). Collar tubes must retain some play [T3.12 - T3.13]
7. Fit the end supports (part T2.B) and secure them [T3.9 - T3.11]
EN
8. Mount the large stabilizers (part T2.K) at an angle of 60 degrees [T3.14 - T3.18]
9. Move the platform (part T2.F) to the 6th rung of the folding frame (part T2.A) and secure it [T3.3 - T3.4]
10. Place a diagonal brace (part T2.H) from rung 1 to rung 5 [T3.7 - T3.8]
11. Sit in the platform hatch and position the double guardrail braces (part T2.I) from the inside out [T3.5 - 3.6]
12. Stand on the platform and place the diagonal braces (part T2.H) from rung 8 to 11 [T3.7 – 3.8]
13. Mount the collar tubes (part T2.D) on the folding frame (part T2.B). Collar tubes must retain some play [T3.12 - T3.13]
14. Fit the end supports (part T2.B) and secure them [T3.9 - T3.11]
15. Place the platform (part T2.F) on rung 13 and secure it [T3.3 - T3.4]
16. Sit in the platform hatch and position the double guardrail braces (part T2.I) from the inside out [T3.5 - 3.6]
17. Stand on the platform and place the diagonal braces (part T2.H) from rung 15 to 19
18. Fit and secure the end supports (part T2.C) [T3.9 - T3.11]
19. Place the platform (part T2.F) on rung 20 and secure it [T3.3 - T3.4]
20. Sit in the platform hatch and position the double guardrail brace (part T2.I) on one side and the 2 horizontal braces (part T2.G) on the
other side from the inside to the outside [T3.5 - T3.6]
21. Mount the side board holders and side boards (part T2.L).
22. Move the platform (part T2.F) from rung 6 to rung 1
23. Place a total of 40 KG of ballast evenly distributed on the platform. 2 x ballast (art.no. 415270, 20 kg) or equivalent alternative
The scaffold is now ready for use.
Control card
After assembly, the scaffold should be provided with a control card (clearly visible from the ground) on which the following information is
entered:
•
Contact details responsible person
•
Whether the scaffolding is ready for use
•
Load class and the equalized load
•
Whether the scaffolding is intended for indoor or outdoor use
•
Date of assembly
7. Check before use
1. Check that the rolling tower is horizontal (check using a spirit level)
2. Check that all wheels are on the brake.
3. Check that the stabilizers are properly adjusted and make good contact with the ground.
4. Check that the rolling tower is assembled in accordance with this manual and in conformity with the configuration and ballast table.
5. Check that the environmental factors, such as swinging doors ,awnings that operate automatically, aboveground electrical cables,
traffic and/or passers-by, etc., do not lead to dangerous situations.
6. Check that the rolling tower can be used safely and that it is suitable for the intended purpose.
8. Moving the rolling tower
The rolling tower may only be moved while observing the following conditions:
1. Before moving the rolling tower, the height has to be reduced to a maximum of 6.2 metres.
2. Do not move a rolling tower in winds exceeding 12.7 m/s (max. 6 Beaufort).
3. When the rolling tower is moved, persons and/or materials may not remain on the rolling tower.
4. Beforehand, checks should be made that the environmental factors, such as swinging doors, canopies, pits, automatically functioning
awnings, aboveground electrical cables, traffic and/or passers-by, etc. do not lead to dangerous situations while the scaffold is
moved.
5. In order to move the scaffold, the stabilisers can only be raised to a maximum of 3 cm.
6. Before moving the rolling tower, all wheels must be removed from the brake.
7. Only move the scaffold manually in a lengthways direction, over a flat, horizontal and sufficiently load-bearing surface.
8. After moving the rolling tower, check all the points listed in Section 7 "Before Using".