Carrier 40VD005S-7S-QEE Manual De Instalación Y Propietario página 19

Ocultar thumbs Ver también para 40VD005S-7S-QEE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 114
Installation Procedures
8. Refrigerant Tube
Piping Permissible Length & Height Difference
Please refer to the attached manual of outdoor units
Piping Materials & Heat Insulating Materials
So as to prevent condensation, heat insulating treatment should be performed. The heat insulating treatment for gas
and liquid piping should be carried out respectively.
Piping Material
Heat Insulating Material
exhaust fan
example of bad installation
Vesicant polythene thickness: over 7mm
12
Hard PVC tube VP31.5mm(inner bore)

Publicidad

Tabla de contenido
loading

Tabla de contenido