Finishing The Installation - Hinkley COLLIER 54 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FINISHING THE INSTALLATION

1
1
Tuck connections neatly into ceiling outlet box.
2
Slide the canopy up to mounting bracket and place the
2
key hole on the trim ring the screw on the mounting
bracket, turn canopy until it locks in place at the narrow
section of the key holes.
Align the circular hole on canopy with the remaining
3
hole on the mounting bracket, secure by tightening the
two set screws.
NOTE: Adjust the canopy screws as necessary until the
canopy and trim ring are snug.
Make sure the hook on the hanging bracket properly sits in the groove in the hanger ball before
attaching the canopy to the bracket by turning the housing until it drops into place.
Ceiling Fan
Outlet Box
Hanger
Bracket
Canopy
Trim Ring
WARNING:
Groove
Screws
©2020 Hinkley Lighting, Inc. | hinkley.com |
09

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

903254fpw-lid54 collier

Tabla de contenido