Section 3 — Standard or Service Entrance Transfer Switch Installation
Battery Charger Installation Guidelines
Figure 3.4 — RTSE Fuse Block Installation T1
Connection
Figure 3.5 — RTSE Neutral Connection
4
Figure 3.6 — RTSE Fuse Block Installation When
Completed
3.1.2 CHARGER MOUNTING
1.
Remove the cover over the controller in the generator
2.
The battery charger can be located anywhere within the con-
trols area on the generator. It is convenient to mount the char-
ger on the vertical surface on right-hand side of the controller
(Figure 3.7).
3.
Clean the surface where the charger is to be mounted prior to
mounting with a damp cloth and wait for the area to dry.
4.
Remove the adhesive covering on the backside of the char-
ger and firmly press the charger into place as shown. Once
mounted the charger may be removed for inspection by sepa-
rating the hook & loop mounting (Figure 3.8).