Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 61
English

Shut-down

Note!
If several pumps are included in the sys-
tem, make sure you know which one
should be stopped first.
Slowly reduce the flow rate in order to
1
avoid water hammer.
When the valve is closed, stop the pump.
2
Repeat steps 1–2 for the other medium/
3
media.
If the fusion plate heat exchanger is shut
4
down for a longer period, it should be
drained.
Draining should also be done if the pro-
cess is shut down and the ambient
temperature is below freezing temperature
of the media.
Depending on the media processed, it is
also recommended to rinse and dry the
heat exchanger and its connections.
EN
12
All manuals and user guides at all-guides.com
Operation
Plate Heat Exchanger

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Alfanova 400

Tabla de contenido