7 - Mounting the rack

Before you start installing the rack, check the mechanical stops of the gate. If they are missing or not strong enough you need to install them.
If you are using the screw rack it is advisable to assemble the modules to verify that the fixing points do interfere with the movement of the wheels
(see Figure 8).
OK
-
There should be a clearance of 1.5 mm. between the pinion and rack over the whole length of the gate (Fig. 9). To adjust the clearance between
the pinion and the rack, refer to paragraph "6 - Operator height adjustment and fixing".
N.B.: This operation is very important for the operation and durability of the gear motor. The load of the gate should not weigh on the pinion because it
may damage the automatic gate system.
-
After unlocking the actuator close the gate completely.
Rest the rack against the pinion of the gear motor. Before doing the drilling for fixing, check that the screws do not interfere with the movement of
the wheels.
12
Fig. 7
NO
OK
OK OK OK
1.5 mm obtained at the end of the adjustment
EN
NO
OK
Fig. 9
Fig. 8