Descargar Imprimir esta página

Wieland SA-PROFIBUS-DP Instrucciones De Uso página 8

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
Dimensions
SA-PROFIBUS-DP-A
Installation
Place device on mounting rail.
Attention
Ensure that grounding spring is in the correct
position. The grounding spring on the module
must make a secure and electrically conductive
connection with the mounting rail.
Dismantling
Remove the plug-in terminals with wiring and
end clamps.
Subject to changes
Headquarter:
Wieland Electric GmbH
Brennerstraße 10 - 14
D-96052 Bamberg
8
All manuals and user guides at all-guides.com
Snap the module onto the mounting rail by
pressing gently in the direction of the arrow.
Attention
Push the modules apart one at a time in the
direction of the arrow until the connectors at
the sides disengage.
Sales and Marketing Center:
Wieland Electric GmbH
Benzstraße 9
D-96052 Bamberg
SA-PROFIBUS-DP-C
Push the modules together one at a time in the
direction of the arrow until the connectors at
the sides engage and then install the end
clamps at the left and right ends.
Push down at the back.
While pressing down, remove the module from
the mounting rail in the direction of the arrow.
Phone +49 (0) 9 51/93 24-0
Fax +49 (0) 9 51/93 24-198
Technical Hotline +49 (0) 9 51/93 24-995
www.wieland-electric.com
info@wieland-electric.com

Publicidad

loading