3
Figure 4
7
6
Frame
Header
Figure 6
8
PAGE 4 OF 12
ASSEMBLY CONTINUED
7. Insert rear legs (3) into outside corner between the
8. Place door and frame assemblies (6 and 7) over
9. With two people, being careful not to put all the
JOINING UNITS TOGETHER
1. If joining a 3-wide unit beside another unit,
Figure 5
2. With two people, being careful not to put all the
Frame
Sill
SECURING UNITS
1. Anchor units to wall or floor. Units are not intended
2. Use supplied leveling feet and hardware (8) to level
1-800-295-5510
uline.com
bottom and the side. Bolt leg to side using two bolts
and nuts per leg. (See Figure 4)
the locker body. Make certain that body sides are
inside frames, not between the frames. Attach top
to frame header and bottom to frame sill (one bolt
each). (See Figure 5) If joining a 3-wide unit beside
another unit skip to JOINING UNITS TOGETHER.
weight on the rear legs, stand unit upright and
place in desired location. Check and tighten all
permanent bolts.
temporarily install a bolt and nut into the third and
sixth holes down from the top of the outer frame(s)
that will be joined to the adjacent locker frame(s).
(See Figure 6)
weight on the rear legs, stand units upright and
place in desired location. Remove bolts placed
temporarily. Using those bolts, bolt adjacent units
together through frames. Check and tighten all
bolts.
NOTE: If the bolts placed temporarily are not
removed before the frames are joined side by
side, the frames will have a 1/8" gap between
them.
to stand free and may topple if not secured. (Units
standing back to back should be bolted together.)
CAUTION: Care must be taken to assure
that lockers are set plumb and true before
anchoring.
the unit. (See Figure 6)
0321 IH-4291