INSTALLATION OF LIMIT SWITCHES
Install limit switches on the rack (fig. 1) and fix them
using the screws provided in the tool kit.
The limit switches are wired for installation with the
motor on the right of the gate opening.
If the motor is installed on the left of the gate opening,
it will be necessary to invert the blue and brown cables
on the limit switch (fig. 2) and also the motor connector
(1-2-3) on the control unit (fig. 3).
Fig. 1
Fig. 2
Fig. 3
All manuals and user guides at all-guides.com
12
MOTOR OVERRIDING SYSTEM
In case of a blackout, the gate can be operated directly
from the motor. Insert the key supplied in the lock 1 on
the front side of the motor, perform 1/4 of a turn and
open the plastic door completely.
To restore the automation, simply close the door, rotate
the key in closed position and slide the specially provi-
ded plastic cover onto the lock.
ATTENTION! In case the leaf overruns its final position
and impacts against the safety stroke end (i.e. wrong
regulation of the limit switches),and a manual unclamp
would be necessary, before using the above procedure,
you have to replace the leaf setting away from the
safety stroke end using the flat screw on the main
motor shaft 2 with a screwdriver.