INSTALLATION LAYOUT
POWER SUPPLY
230VAC - 50Hz / 120VAC - 60Hz
Cable 3 x 1,5 mm
2
CAUTION! ALL THE CABLES USED FOR THE INSTALLATION MUST BE MARKED WITH T100°C.
INSTALLATION OF BLINKING LAMP
AND CONTROL DEVICES
(safety and control buttons).
The blinking lamp shall be installed in the most visible
position both inside and outside the gate.
The control button can have series or parallel connec-
tions (by properly programming the power plant accor-
ding to the indications shown in table 2).
The series connection is mandatory for the safety block
buttons.
EXTERNAL ANTENNA
It deals with a wide range antenna having a 433.92
MHz frequency, equipped with a fastening device and a
2,5 m RG – 58 coaxial cable.
All manuals and user guides at all-guides.com
2 x 1 mm
2
13
RG - 58
2 x 1 mm
2
INSTALLATION OF THE INFRARED
SURVEY SYSTEM
(Photocells).
This operation shall be carried out according to the
manufacturer's instructions only. According to the per-
fect assembly position, the optical axis between the
receiver and the infrared transmitter should be 30-60
cm from the earth and 10 cm from the door.
External side
Internal side
Operation: during the gate closing, when passing
through the photocells, the gate stops and opens
again, to avoid the obstacle.
Before installation please read carefully the
instructions regarding the product RIF50.
2 x 1 mm
2