Installation instructions
SECURY 21 EK | 21 EK EVP | 21 S | 21 S EVP
Multi-point locks electrically couplable or with monitoring contacts
Check through actuation of the inside and outside lever handle whether
the handles have function (idle).
In the decoupled status (operating voltage off), couple in the inside and
outside lever handle using the locking cylinder / cylinder cam.
Check whether all latchbolts are completely pulled back when both the
inside and the outside lever handle are actuated.
Check whether the inside and outside lever handles can be pressed down
easily.
Release the lever handles so they return to the initial position.
Check whether the three latchbolts are projected automatically and
completely through pressing on the trigger lever.
Make sure that all three latchbolts are completely projected.
Check through pressing on the latchbolts (max. 20 N) whether they are
secured against being forced back.
Decouple the inside and outside lever handle again using the locking
cylinder / cylinder cam. The lever handles must have no function now
(idle).
Couple the inside and outside lever handle electrically.
Check whether all latchbolts are completely pulled back when both the
inside and the outside lever handle are actuated.
Now decouple electrically the inside and outside lever handle again. The
lever handles must have no function now (idle).
Separate the multi-point lock from the power circuit.
Operating current (fail-secure) version:
Quiescent current (fail-safe) version:
Make sure that, after the test, all latchbolts are pulled back, i.e. all
latchbolts are in the initial position.
DE
50
All manuals and user guides at all-guides.com
Check whether the inside and outside lever handles are decoupled (idle).
Check whether the inside and outside lever handle are coupled in.
EN
FR
ES
04.2016 | G31347 | Designed in Germany