Connect Shift Rod; Assemble Chute And Rotator; Assemble Split Rod - Snapper 1226 Manual Del Operador

Ocultar thumbs Ver también para 1226:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly

CONNECT SHIFT ROD

1.
Connect shift rod (A, Figure 7) to shift lever (B) and
secure with lock washer (C) and 5/16 lock nut (D).
Tighten lock nut with a 1/2" wrench while preventing
stud (E) from turning with a 7/16" wrench.

ASSEMBLE CHUTE AND ROTATOR

1.
Bring chute from pallet to the left side of snowthrow-
er.
2.
Slide the chute base (A, Figure 8) onto the auger
housing (B).
3.
Slide support tube (C) on the carriage bolts (D).
4.
Thread two 3/8" flange nuts (A, Figure 9) onto car-
riage bolts and tighten with a 9/16" wrench.

ASSEMBLE SPLIT ROD

1.
Take end of split rod (A, Figure 10) that is attached to
top back side of chute assembly and align it to right
side of split rod protruding from dash.
2.
Insert two small carriage bolts (B) into square holes
of split rod.
3.
Install 1/4" lock nuts (C) and tighten hardware with a
7/16" wrench.
All manuals and user guides at all-guides.com
12
D
C
B
Connect Shift Rod
A
B
Chute and Rotator Assembly
Carriage Bolts
Split Rod Assembly
A
E
Figure 7
C
D
Figure 8
A
Figure 9
C
B
A
B
C
Figure 10

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1695571

Tabla de contenido