a. Remove the lock nuts from the cable
glands and mount the cable glands on
the power supply cable and (optionally)
on the CT coil cable and Ethernet cable
with their sealing nuts on the outside
of the wallbox.
b. Insert the supply cables from the back
of the wallbox through the cable ope-
ning of the main assembly.
c. Make sure the following lengths of
cables are available after the cable
glands, then tighten each cable gland.
› Power supply cable: > 180 mm.
› CT coil cable (optional): > 80 mm.
› Ethernet cable (optional): > 400 mm.
d. Secure the cable glands by tightening
their lock nuts.
Mount main assembly
onto wall bracket
See the corresponding
illustrations in manual B.
1. Engage the top edge of the main assem-
bly with the top of the wall bracket and
then rotate the main assembly so it is flat
on the wall bracket.
2. Mount main assembly.
Warning
Not mounting all the screws and washers on
the inside of the main assembly when moun-
ting it onto the wall bracket will affect the
protection against moisture of the wallbox,
which can result in the risk of electric shock.
› Make sure that all screws together with
their corresponding washers are mounted.
While holding the main assembly in place,
insert the four screws M6 x 16 mm together
with the bonded sealing washers 6.6 mm x
11 mm and fasten them.
Assemble wallbox
See the corresponding
illustrations in manual B.
1. Install power supply cable.
Caution
Using stranded wires without ferrules may
result in improper installation, which can
cause accelerated aging of electric compo-
nents and/or loss of electric connection.
› Use crimped insulated ferrules for 1-phase
installation.
› Use crimped uninsulated ferrules for
3-phase installation.
a. Strip the outer insulation of the cable
to a length of 50 mm, then strip the
individual wires to 12 mm.
b. Route the cables to their connection
terminals. Ensure that the bending
radius is within the limits for the cable
type.
c. Connect the wires according to the Audi
Wallbox model and the color coding
table below.
A. Audi Wallbox pro with kWh meter
a. Connect L1 (as well as L2 and L3 - for
3-phase version) wire(s) of the power
supply cable to L1, L2, L3 terminals of
kWh meter.
b. Connect Neutral (N) wire of the power
supply cable to the N feed-through ter-
minal, located next to the kWh meter.
c. Connect PE wire of the power supply
cable to the first available slot of the PE
feed-through terminal, located next to
the kWh meter.
27