Jacobsen Greens King IV Plus ROPS Manual De Seguridad, Funcionamiento Y Mantenimiento página 26

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6
OPERATION
How to calculate a slope:
Tools Required:
Level (A), either 1 yard, or 1 meter long.
Tape measure (B).
With the level (A) positioned horizontally, measure the
distance (C) with tape measure (B). Use the chart to
calculate either the slope angle or the % grade of the
slope (D).
Inches with 1 Yard Level (A)
3
6
7.5
9
10
11
12
13
14
15
16
18
20
25
30
36
26
All manuals and user guides at all-guides.com
Height (C)
Millimeters with 1 Meter Level (A)
100
150
200
225
250
275
300
325
350
375
400
425
475
500
600
800
900
1000
B
A
C
D
Result (D)
Slope in Degrees
4.8
5.7
8.5
9.5
11.3
11.8
12.7
14
15.4
15.5
16.7
17.0
18.0
18.4
19.3
19.9
20.6
21.3
21.8
22.6
23.0
24
25.4
26.6
29.1
31.0
34.8
38.7
39.8
42.0
45.0
Figure 6D
Slope Grade
8.3
10.0
15
16.7
20.0
20.8
22.5
25.0
27.5
27.8
30.0
30.6
32.5
33.3
35.0
36.1
37.5
38.9
40.0
41.7
42.5
44.4
47.5
50.0
55.6
60.0
69.4
80.0
83.3
90
100

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido